Interim report 01/2013: Partial failure of a structure inside Balcombe tunnel

RAIB interim report into a partial failure of a structure inside Balcombe tunnel on 23 September 2011

The Rail Accident Investigation Branch (RAIB)Ìýhas released its interim report intoÌýa partial failure of a structure inside Balcombe tunnel on 23 September 2011.

Ìý

Updates to this page

Published 10 December 2014