Independent report

Hammersmith Bridge: engineering reports

Reviews by AECOM and the University of Cambridge's Professor Fleck of the modelling and analysis taken of Hammersmith Bridge by other engineering consultants.

Documents

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email webmasterdft@dft.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Request an accessible format.
If you use assistive technology (such as a screen reader) and need a version of this document in a more accessible format, please email webmasterdft@dft.gov.uk. Please tell us what format you need. It will help us if you say what assistive technology you use.

Details

In 2019, a detailed inspection of Hammersmith Bridge바카라 사이트™s cast iron pedestals, which support the suspension chains, identified cracks in 3 of them, so it was closed to all motorised traffic and an acoustic monitoring system installed.

A case for continued safe operation (CCSO) was also prepared, which allowed the bridge to remain open to pedestrians, cyclists and river traffic beneath it.

During hot weather in August 2020, the monitoring system detected an 바카라 사이트˜event바카라 사이트™ so the bridge was closed to all traffic.

In September 2020, the Department for Transport (DfT) commissioned consultants AECOM to review the recent engineering studies of the bridge바카라 사이트™s condition. AECOM conclude that our understanding of the bridge바카라 사이트™s behaviour has improved considerably since the CCSO was written and recommend that it is revisited, alongside 15 other recommendations.

At the same time, the DfT commissioned Professor Norman Fleck of the University of Camridge 바카라 사이트“ an expert in fracture mechanics 바카라 사이트“ to review recent analysis and reports on the bridge, and comment on the condition of the pedestals.

Updates to this page

Published 10 December 2020