Detail of outcome
바카라 사이트Consideration of consultation responses바카라 사이트 gives an overview of the consultation responses received by the Airports Commission in the various areas of its analysis and explains how it has responded to the points made. The Airports Commission바카라 사이트s recommendations following consultation are set out in its Final report.
The 바카라 사이트Analysis of the Airports Commission바카라 사이트s consultation responses바카라 사이트 provides detail on responses to the consultation, including:
- a summary of the themes raised by respondents
- a coding framework capturing all of the points made in the more than 70,000 responses
- an explanation of how the consultation was managed and how responses were analysed
바카라 사이트Analysis of the Airports Commission바카라 사이트s consultation responses: associated appendices바카라 사이트 contains a full list of all of the organisations who responded to the Airports Commission바카라 사이트s main consultation.
The Commission has also published the technical responses it received.
Feedback received
Detail of feedback received
As set out in 바카라 사이트Consideration of consultation responses바카라 사이트, the Airports Commission has published the substantive, technical responses received to its main consultation and air quality consultation. This comprises responses from both organisations and members of the public. The judgement of what should be included as a substantive or technical response has been informed by the length and technical complexity of the submissions, and in most cases appendices to main submissions have not been published.
Original consultation
Consultation description
The Airports Commission is seeking your views on 3 options for a new runway in the south east of England, and on its assessments of these options. In particular, the Commission wishes to:
- test the evidence base it has assembled
- understand stakeholders바카라 사이트 views as to the accuracy, relevance and breadth of the assessments it has undertaken
- seek views on the potential conclusions that might be drawn from them
The Commission also welcomes evidence and ideas about improving the short-listed options (eg through mitigation measures to address specific impacts).
The consultation consists of a large number of documents. This page features the commission바카라 사이트s overarching consultation document, a sustainability assessment and business case for each of the 3 schemes. Detailed technical reports which underpin the commission바카라 사이트s analysis have also been published, along with an index to help you navigate them.
Work submitted to the Commission by the 3 scheme promoters; Gatwick Airport Limited, Heathrow Airport Limited and Heathrow Hub Limited has also been published.
You can also find out about the public engagement that the Commission has undertaken during the consultation.
Update to consultation: 25 November 2014
A new paragraph, paragraph 3.148 on page 82, was inserted in the 바카라 사이트Consultation document바카라 사이트 on 25 November 2014. The paragraph was accidentally omitted from the initial 바카라 사이트Consultation document바카라 사이트 during the typesetting process.
Update to consultation: 17 December 2014
A new report 바카라 사이트Impacts of expanding airport capacity on competition and connectivity바카라 사이트 has been added to the strategic fit technical reports collection.
Update to consultation: 19 December 2014
An addendum covering 바카라 사이트national and local noise assessment바카라 사이트 has been added to the noise analysis technical reports collection.
Update to consultation: 19 January 2015
Granular data on forecast passenger numbers for a number of smaller regional UK airports have been published alongside our strategic fit analysis documents . In the original documents this information was aggregated under the heading of 바카라 사이트other UK airports바카라 사이트 in the 바카라 사이트Forecasts report바카라 사이트.
Update to consultation: 22 January 2015
All underlying data for the charts in the cost and commercial viability technical documents prepared by PricewaterhouseCoopers (PwC) has now been published in spreadsheet format. Some of these charts were identified as showing data other than that referred to in the consultation reports. In these instances, the charts have been updated in the spreadsheet to show data based on the correct scenarios. This update does not affect any of the analysis, figures and commentary elsewhere in the reports.
Update to consultation: 23 January 2015
There has been a revision to the underlying indexation assumptions for the core capex and asset replacement costs for the:
- Heathrow north west
- Heathrow extended northern
runway schemes. As an example, our advisers have re-run 1 scenario to consider the impact of the change on aeronautical charges and the financing requirement. This results in an increase of the order of 1% to both outputs, which is not considered material to the work of the commission. The commission is advising consultees of this impact, but is not planning to amend the underlying cost and commercial viability reports.