Appendix B 바카라 사이트“ procurement and information delivery milestones: contractor requirements

Published 30 November 2021

Applies to England

The scheme specific detailed exchange information requirements (EIRs) will set out the documentation required to be provided by contractors at each RIBA PoW stage as part of the procurement gateways. The below is a summary of the procurement gateways for each value band, to be read in conjunction with the Appendix A timeline document.

High Value Band 바카라 사이트“ route A1:

  • PITT
  • ITT
  • RIBA stage 3 contractor바카라 사이트™s deliverables
  • RIBA stage 4 contractor바카라 사이트™s proposals

High value band 바카라 사이트“ Route A2:

  • ITT
  • RIBA stage 3 contractor바카라 사이트™s deliverables
  • RIBA stage 4 contractor바카라 사이트™s proposals

Medium or low value band 바카라 사이트“ Route A3:

  • ITT
  • RIBA stage 3 contractor바카라 사이트™s deliverables
  • RIBA stage 4 contractor바카라 사이트™s proposals