BND1: Maintain dry stone walls
What you must do to get paid for this action and advice on how to do it.
This is an action in the Sustainable Farming Incentive (SFI) scheme: expanded offer for 2024. You must read the SFI scheme information to understand the scheme rules and how to apply.
Duration
3 years
How much you바카라 사이트™ll be paid
£27 per 100 metres (m) for both sides
Action바카라 사이트™s aim
This action바카라 사이트™s aim is that there are dry stone walls maintained in good condition.
The purpose of this is to:
- help manage livestock
- provide habitats for lichens, mosses, ferns and wildlife
- maintain landscape and historic features
Where you can do this action
An eligible dry stone wall for this action must be:
- a vertical structure that바카라 사이트™s built of natural stone
- of traditional dry stone wall construction, which can include mortar if it바카라 사이트™s part of the traditional stone walling method
- at least 20m long, measured between 2 end points 바카라 사이트“ read the 바카라 사이트˜advice to help you do this action바카라 사이트™ to find out how to measure this
- in good condition
To be in good condition, the dry stone wall must be both:
- continuous 바카라 사이트“ which means there are no gaps along its entire length, apart from structural wall features such as stiles, stone gate posts and sheep creeps
- complete 바카라 사이트“ which means the wall is at a height in keeping with local style, with top stones in place if they바카라 사이트™re part of the local style
You can only do this action on both sides of the entire length of an eligible dry stone wall. This means you must have management control of both sides of the wall.
You can enter both sides of a roadside wall, or a wall that borders a neighbour바카라 사이트™s land, if you meet both of following conditions:
- you have a legal right or obligation to maintain the wall
- you can meet this action바카라 사이트™s requirements
Eligibility of protected land
Protected land | Eligibility |
---|---|
Sites of special scientific interest (SSSIs) | Eligible 바카라 사이트“ you must get SSSI consent before you do this action (read section 10.3바카라 사이트¯바카라 사이트˜SSSI consent바카라 사이트™ in the SFI scheme information to find out how to do this) |
Historic and archaeological features | Eligible 바카라 사이트“ you must get a SFI HEFER before you do this action (read section 5.6 바카라 사이트˜Land with historic or archaeological features바카라 사이트™ in the SFI scheme information to find out how to do this) |
Available area you can enter into this action
Not applicable, as this is a linear action.
Rotational or static action
This action is static. This means you must do it at the same location each year of this action바카라 사이트™s duration.
What to do
You must maintain dry stone walls entered into this action in good condition. To do this, you must:
- visually check their condition and identify any sections that need to be repaired
- carry out any necessary repairs
- keep a record (written or photographic) of any need for repairs you identify, and the repair work you do 바카라 사이트“ including the date you identify the need and when the work was done
When you carry out any necessary repairs, you must:
- use materials in keeping with the local style and characteristic
- retain any existing features such as top stones, sheep creeps, stiles and stone gate posts
When to do it
You must:
- check the condition of the walls at least once during each year of this action바카라 사이트™s 3-year duration
- carry out any necessary repairs within 12 months of identifying the need, or by this action바카라 사이트™s end date if you identify the need for repairs during the final year of this action바카라 사이트™s duration
How to do it
It바카라 사이트™s up to you how you do this action, as long as you:
- follow this action바카라 사이트™s requirements 바카라 사이트“ these are identified by a 바카라 사이트˜must바카라 사이트™
- do the action in a way that could reasonably be expected to achieve this action바카라 사이트™s aim
You may find it helpful to read the 바카라 사이트˜advice to help you do this action바카라 사이트™, but it바카라 사이트™s not part of this action바카라 사이트™s requirements.
Evidence to keep
You must keep the required written or photographic record and supply this evidence if we ask for it.
Other actions or options you can do with this action
You can do the following actions or options in land parcels with eligible boundaries entered into this action.
Scheme | Action or option codes |
---|---|
SFI 2024 actions | All SFI 2024 actions, except BND2, CHRW1, CHRW2, CHRW3 and WBD2 |
SFI 2023 actions | All SFI 2023 actions, except HRW1, HRW2 and HRW3 |
CS options | All CS management options, except BE3 |
ES options | All ES revenue options, except boundary options |
SFI pilot standards | All SFI pilot standards, except the SFI pilot hedgerows standard |
Advice to help you do this action
The following advice may help you to do this action, but it바카라 사이트™s not part of this action바카라 사이트™s requirements.
How to measure your dry stone wall
For the purposes of measuring the length of your dry stone wall between 2 end points, an end point can include:
- a point of connection with another wall, bank, hedgerow or other features (such as a fence, ditch, road or building)
- where the feature changes management control or ownership
How to visually check the condition of your dry stone walls
This action requires you to visually check the condition of your dry stone walls and identify any sections that need to be repaired.
When you visually check the condition of your walls, factors which could mean your walls need to be repaired include:
- fallen stones
- slumping
- overgrown vegetation
- damage by livestock
- damage by machinery
How to carry out necessary repairs
Before you carry out any necessary repairs on your dry stone wall, check for signs of nesting birds. Birds, nests and eggs are protected by law, so if you see signs of nesting birds, delay work until the birds fledge.
When you carry out any necessary repairs on your wall, try to:
- use original stone, where it바카라 사이트™s available 바카라 사이트“ if the original stone is not reusable, you can source replacement stone that바카라 사이트™s in keeping with the local style and characteristic (which has not been removed from other walls or historic or archaeological features)
- if stones have lichen growth, use them with the growth facing outwards
- transport materials when conditions are dry 바카라 사이트“ this will help to avoid damaging the ground
- remove leftover materials from the site after you have carried out the work
- restore the ground where you have carried out the work
Updates to this page
-
Added 'BND2: Maintain earth banks or stone-faced hedgebanks' to list of SFI 2024 actions which are not compatible with 'BND1: Maintain dry stone walls'.
-
Eligibility of protected land - updated link to section 10.3 바카라 사이트˜SSSI consent바카라 사이트™ in the SFI scheme information. Published voluntary advice to help you do this action, but it's not part of this action바카라 사이트™s requirements.
-
First published.